Construction operations background
Built for Construction CFOs and COOs

Your Project Margins Are
Invisible Until It's Too Late.

Job costing, subcontractor invoicing, project margins — all manual and fragmented. Your highest-paid people are doing the lowest-value work. We build the infrastructure that makes it stop.

50-500 employees. Multiple job sites. High transaction volume.

The Reality

The Margin Leak Nobody Talks About.

Every construction company over 50 employees has the same hidden problem: the data exists, but nobody can see it in time to act on it.

Invoice Reconciliation by Hand

Subcontractor invoices reconciled manually across dozens of active jobs. AP matching line items to POs, chasing change orders across three different systems.

Margins Unknown Until Close-Out

Project margins remain a mystery until the job is complete. By then, the opportunity to course-correct has already passed.

Data Scattered Everywhere

Procore, QuickBooks, Excel, email inboxes. The data exists in five systems but lives in zero dashboards. Nobody has a single source of truth.

Bid Leveling Takes Days

Estimating teams spending days on bid leveling that should take minutes. Different formats, missing scope items, exclusions buried in fine print.

"We had a $2.3M project where we didn't realize the margin had eroded to 4% until close-out. If we had seen it at month three, we could have saved six figures."

-- General Contractor, 280 employees

How We Solve It

From Diagnosis to Operational Intelligence.

We don't sell software licenses. We build production-ready systems, not strategy decks. Every engagement starts by understanding where value hides in your operation.

Diagnostic

$3,000 -- $15,000|1 -- 4 weeks

We audit your project data flow -- from estimating through close-out -- and show you exactly where margin leaks, time waste, and decision blind spots live.

Process mappingData flow auditMargin leak identificationPriority recommendations

Productized Builds

$5,000 -- $15,000|2 -- 4 weeks

Pre-built solutions engineered for construction, deployed with minimal disruption.

Invoice Reconciliation Engine

Matches subcontractor invoices to POs automatically. Flags discrepancies, missing change orders, and overbilling. Your AP team reviews exceptions, not line items.

Live Project Margin Dashboard

Real-time margin visibility across every active job. Pulls from Procore, QuickBooks, and your cost codes. Updated automatically, not when someone remembers to run a report.

Targeted Builds

$15,000 -- $75,000|2 -- 14 weeks

Custom-scoped systems built around your specific operational pain.

Procore + Accounting Integration

Custom data pipeline connecting project management to your accounting system. Eliminates dual entry and reconciliation gaps.

Bid Analysis System

Reads sub bids in any format. Normalizes scope, flags exclusions, and surfaces the real comparison -- not just the bottom-line number.

Custom Decision Engines

Automated workflows that route data, trigger alerts, and surface the decisions that need human attention -- before the project goes sideways.

Ongoing Partnership

$150,000 -- $500,000|6 -- 12 months

A unified operational intelligence layer across all jobs, departments, and systems. Every cost code, every change order, every margin number -- visible in real time to the people who need it.

100%
Margin Visibility
Real-Time
Cost Tracking
Every System
Connected
One View
All Decisions
The Math

What This Problem Costs a $50M Contractor.

These numbers come from real engagements with general contractors running 20-80 active jobs.

$180K+
Annual Cost of Manual Reconciliation

Senior AP staff spending 60%+ of their time matching invoices to POs by hand. That is not an AP problem -- it is an infrastructure problem.

2-5%
Margin Erosion Per Project

When margins are invisible until close-out, there is no mechanism to intervene. On a $50M book, 2-5% is $1M-$2.5M in preventable loss.

3-5 Days
Per Bid Leveling Cycle

Your estimating team is spending senior-level hours on data extraction and formatting. The judgment work takes 20% of the time -- the rest is process waste.

For a typical 200-employee GC, the all-in cost of these problems exceeds $1.5M annually.

Most of that cost is invisible because it is distributed across departments, buried in labor overhead, and accepted as "just how construction works."

A diagnostic engagement typically surfaces $300K-$800K in recoverable value.

We Integrate With Your Existing Stack

Procore
QuickBooks
Sage 300
Viewpoint
Excel / CSV
Foundation
The Process

How It Works.

Every engagement starts the same way: we understand your operation before we build anything.

1

Diagnostic Call

We map your current data flow, identify bottlenecks, and quantify the cost of your existing process gaps.

2

Scope and Proposal

Based on the diagnostic, we define exactly what gets built, what it connects to, and what the measurable outcome will be.

3

Build and Deploy

We build production-ready infrastructure that integrates with your existing systems. Your team is trained before go-live.

4

Measure and Iterate

We measure against the outcomes defined in the proposal. If it is not delivering value, we keep working until it does.

Built-For-You Infrastructure. Measurable Results.

We define success metrics before we start building. If the system does not deliver measurable operational value, we keep working at no additional cost until it does. We build production-ready systems, not strategy decks.

Stop Guessing at Project Margins.

A Construction Diagnostic maps your data flow, quantifies the cost of your current process, and shows you exactly where to start. No pitch. No commitment.

Book a Discovery Call

Diagnostic engagements start at $3,000. Productized builds from $5,000. Fixed scope. Fixed price.